China Union: At the end of 2022, the non-fossil energy generating power loader accounted for the total installed load, and it is expected to reach 50%.

Home > Finance

China Union: At the end of 2022, the non-fossil energy generating power loader accounted for the total installed load, and it is expected to reach 50%.

2022-01-27 18:05:57 44 ℃

Beijing Business News (Reporter Yang Yuehan Lu Yin LingThe installed capacity of approximately 230 million kilowatts, of which the non-fossil energy power generated installation is 180 million kilowatts.It is expected that the full-diameter generated installed capacity is about 26 billion kilowatts at the end of 2022. Among them, the non-fossil energy generated equipment is about 1.3 billion kW, which will be expected to reach half of the scale of the total assembly machine.Hydropower is 410 million kilowatts, and the mesh wind is 380 million kilowatts, and the net solar power is 40 billion kW, the nuclear power is 55.57 million kilowatts, and the biomass power generation is about 45 million kilowatts.The coal-electric installed capacity is 1140 million kW.